North Sea Drilling Optimization

Enhancing drilling performance and reducing NPT in a challenging offshore environment.

Project Overview

North Sea Offshore Rig

Axonai Energy Services was contracted by a major operator to provide comprehensive drilling support for a complex exploration well in the challenging North Sea environment. The project aimed to optimize drilling operations, minimize non-productive time (NPT), and ensure the highest safety and environmental standards.

The well presented several technical challenges, including high-pressure/high-temperature (HPHT) conditions, complex geological formations, and narrow drilling windows. Axonai's role encompassed advanced well design, real-time operational support, and specialized drilling engineering expertise.

Challenges Faced

  • Navigating HPHT conditions requiring specialized equipment and procedures.
  • Complex geological formations leading to potential wellbore instability.
  • Strict environmental regulations specific to the North Sea.
  • Minimizing NPT in a high-cost offshore drilling environment.

Axonai's Solution & Services

Axonai implemented a multi-faceted approach:

  • Advanced Well Design & Engineering: Utilized state-of-the-art modeling for trajectory, casing, and drilling fluid programs, specifically tailored for HPHT conditions.
  • Real-Time Operations Monitoring: Provided 24/7 support from our onshore center, analyzing drilling data to proactively identify and mitigate potential issues.
  • Specialized Personnel: Deployed experienced drilling engineers and supervisors to the rig site for direct operational oversight and decision-making.
  • Rigorous HSE Management: Ensured all operations adhered to Axonai's stringent HSE protocols and client-specific requirements, exceeding regulatory standards.

Results & Benefits

15% Reduction in NPT

Compared to offset wells in the same field.

Zero LTI & Environmental Incidents

Demonstrating commitment to highest HSE standards.

Significant Cost Savings

Achieved through optimized drilling and reduced downtime.

Enhanced Client Satisfaction

Exceeding project objectives and operational targets.